01

Licensing and registration

Roman Contractors Pty Ltd holds a Queensland Building and Construction Commission contractor licence and works as head contractor and as a subcontractor on local government land.

Entity Roman Contractors Pty Ltd
ABN 48 122 536 770
QBCC licence 1276547
States worked QLD, NSW, VIC, SA

02

Insurances

The following policies are held and maintained current. Certificates of currency are issued on request and are provided with tender submissions where the conditions call for them.

Public liability Certificate of currency on request
Professional indemnity Certificate of currency on request
Workers compensation WorkCover Queensland
Plant, equipment and motor vehicle Certificate of currency on request

03

The Roman Management System

Projects are delivered under a single management system covering health and safety, environment, quality, project management and human resources. Every form, policy and procedure in it carries a document number and a revision, and is controlled through a forms register.

Health and safety

Twenty-two controlled WHS forms covering site induction and registers, prestart toolbox, SWMS and the SWMS register, risk matrices, plant and electrical equipment registers, lifting gear, hazardous chemicals, confined space and hot work permits, workplace inspection, and incident reporting and investigation. A WHS legislation register keeps current Queensland legislation, codes of practice and Australian Standards accessible on site.

Quality

Inspection and Test Plans are prepared per project against a lot register, with pile and concrete registers recording the work as it goes in. RFIs are tracked on a register and documents issued under transmittal. Structural design is certified by a registered professional engineer of Queensland.

Environment

An environmental aspects and impacts assessment is prepared for each project, with an Environmental Work Method Statement for the controls. Water quality sampling is recorded on a register where the works sit in or over water, and environmental performance is reported monthly.

Project management

Each project opens with a project initiation and risk assessment, and is reported through monthly progress, WHS and environmental reports. Daily job summaries record labour, plant and progress against program.

The health and safety management system is structured to meet the requirements of ISO 45001, without third party certification.

04

Policies

Approved by the Managing Director, issued to all personnel and subcontractors at induction. Current copies are provided on request.

  • Health, Safety and Environment
  • Quality
  • Modern Slavery
  • Corporate Social Responsibility
  • Indigenous Employment
  • Workforce Diversity
  • Alcohol and Other Drugs
  • Domestic and Family Violence
  • Return to Work

05

High risk work procedures

Standing procedures for the two highest risk exposures in bridge and boardwalk work.

Working in, on, over or adjacent to water
Covers footbridge and boardwalk construction, piling in water, plant near water edges, work from barges and temporary platforms, flotation devices, rescue equipment and emergency response.
Working at heights
Fall prevention and arrest, edge protection, and access for deck and superstructure work.

Safe Work Method Statements are prepared per activity and per site, reviewed with the crew at prestart, and held on the SWMS register for the project.

06

Prequalification and panels

Local Buy
LGAQ procurement arrangements.
VendorPanel
Registered for council quotation and panel requests.
Council supplier panels
Standing arrangements with individual councils.

Where a council runs its own registration or prequalification process, we will complete it. Send the forms to the office and they will come back inside the closing period.

07

Personnel and training

A directly employed core crew, with design certification and specialist trades engaged as subcontractors.

Tickets, licences and competencies are held on a training and skills register with expiry tracking. All personnel and subcontractors are inducted to the project before starting work, and the induction record is kept for the project.

08

What we require of subcontractors

These are verified before a subcontractor is engaged, and again on expiry.

  • Current QBCC or trade licences, with numbers
  • Public liability and workers compensation, with expiry dates
  • Their own SWMS for the activity, reviewed before work starts
  • Plant registration, inspection records and operator competencies
  • Modern slavery compliance, as a condition of engagement

Requesting documents

Certificates of currency, policies, procedures, a capability statement or a completed prequalification form can be requested through the contact page, or direct from admin@romancontractors.com.au.

Planning a bridge, boardwalk or coastal structure?

Send us the site and what it needs to carry. We price Design and Construct and construct only scopes, and review concepts before they go to tender.

Send a scope