QBCC 1276547 07 3132 5224  ·  admin@romancontractors.com.au

Projects / Boardwalks / Lake Weyba Boardwalk Transitions

Lake Weyba Boardwalk Transitions

Timber steps and capped member ends where the Lake Weyba walking track meets its three composite crossings.

3Crossings finished
4Bedded steps
2024Completed
Lake Weyba Boardwalk Transitions

The last few metres at each end decide whether a crossing in a reserve looks complete. On a natural track surface, the steps and end caps are what walkers notice first. At Lake Weyba, walkers step from the track onto each of the three composite crossings on set timber steps.

Four steps were bedded in black mortar to tie the track surface into the structures. Every exposed composite member end was capped, so each section is finished at both ends. The approaches and end caps were built in 2024 by the same crew who built the crossings.

Project photos

Enquiries

Planning a similar project?

Send us the site and what it needs to carry.