Projects / Civil infrastructure / Port of Brisbane EV Charging, Final Conduit Run

Port of Brisbane EV Charging, Final Conduit Run

The final conduit run for the Port of Brisbane EV chargers, cored through one metre of footpath on an operating port.

1 mFootpath opened
3Conduits
2024Completed

An operating port asks the same of a one metre job as it does of a long run: mobilisation, port inductions, a project specific method statement and a proper reinstatement. This was the final conduit run on the Port of Brisbane EV charging installation, and it got all of them.

We opened the path, then cored and installed two 150 mm electrical conduits and one 50 mm communications conduit. Each was staked and sealed ready for the electrical contractor, and the ground was reinstated with soil and mulch to match the surrounds. Short jobs like this, delivered cleanly on live sites, are a regular part of our work.