Rocky Creek Dam Footbridge Replacement

Walkers at Rocky Creek Dam now cross the creek on a fixed aluminium truss footbridge in place of the pontoon bridge they used before.

Rocky Creek Dam Footbridge Replacement
AluminiumTruss bridge
2018Completed

Rocky Creek Dam park is Rous County Council's public reserve at the head of the Richmond catchment, near Dorroughby in New South Wales. The reserve supplies water, and its walking tracks crossed the creek on a pontoon bridge reached by concrete steps shaped in place on the bank. Council wanted an aluminium truss footbridge on the designated tracks, built with as little disturbance to the surrounding bush as possible. We designed and installed the foundations and the truss sections, and finished in March 2018.

An open deck over the creek

The bridge has a fibre reinforced polymer (FRP) mini mesh deck in place of hardwood. In a water supply catchment the open mesh drains and dries instead of staying damp, and it lets light and leaf litter through to the creek below. On a remote walking track there is no timber deck surface to rot, splinter or replace.

A new timber stairset with non-slip plates leads down to the bridge. We extended its landing and handrail so it meets the existing path levels, and built a compacted gravel hardstand.

Sharing one way in

Council was rebuilding the park's entrance road and car park at the same time, so two contractors shared the reserve's single access while the public used the rest of the park. Our worksite stayed closed to the public. We built the extra working platform for our foundations from fill out of the park upgrade, which saved an import for us and a disposal for the other job.

Services were found by search, a services locator and pot-holing, then marked on site and on a plan held by every trade. Before demolition we photographed adjoining features and gave notice to neighbours. Walkers now have a fixed crossing on the park tracks, and the park upgrade carried on around us without interruption.

What we built

  • Aluminium truss footbridge on timber piles
  • FRP mini mesh deck
  • Timber stairset with non-slip plates and extended landing
  • Compacted gravel hardstand and working platform
  • Removal of the pontoon bridge and old concrete steps

Project photos