QBCC 1276547 07 3132 5224  ·  admin@romancontractors.com.au

Projects / Boardwalks / Village Green Boardwalk, Palmview

Village Green Boardwalk, Palmview

A 3 metre wide elevated boardwalk joining Village Green Stage 7 to the rest of the Palmview estate across a drainage reserve.

3 mPath width
10 mComposite joists
2023Completed

Once the Palmview estate fills with houses, a structure in its drainage reserve will be hard to reach for maintenance. The boardwalk that carries Stage 7 residents across that reserve has no coating, timber or corroding connections to come back for, and gives them a straight walk to the rest of the estate on a 3 m wide path.

The ground varies along the reserve, and the deck had to hold one fixed level for its full length, with bridge sections built into the run where the ground falls away. The alignment was surveyed first, and every foundation position and substructure height was set to the ground as found. Light 10 m composite joists went in without heavy plant standing on the soft ground. We installed the Wagners CFT structure.

Enquiries

Planning a similar boardwalk?

Send us the site and what it needs to carry.